Project Scope

Scope included ten miles of sophisticated two-lane concrete-reinforced roadway, three concrete and steel HL-93 bridges (heavy load bearing) that vary in length between 100 and 500 feet, and six arch culverts ranging from 24 to 30 feet in length.

Project earned an Outstanding final performance evaluation from the client and had a perfect safety record with zero lost-time accidents.

Client

U.S. Army Corps of Engineers