Project Scope
Caddell designed and constructed a new warfare and combat simulations training facility that consisted of three separate buildings on three separate sites. Building One: 168,000 SF (tank simulation); Building Two: 65,000 SF (medium/small arms); Building Three: 10,000 SF (small arms). Scope included all sitework, mechanical, electrical, controls, utilities, fire protection, HVAC, specialty items, landscaping, interior finishes, and miscellaneous other scope items. The project team also assisted the Government by coordinating the installation of training simulation equipment and systems.
Client
U.S. Army Corps of Engineers