Project Scope
Scope consisted of the construction of the 1,000,000 SF Final Assembly Building and the 100,000 SF Administration Building at one of Toyota’s most important overseas manufacturing plants. The Final Assembly Building is a single-level structural steel building with metal siding and brick wainscoting. The Administration Building is two stories of structural steel with masonry block walls and a brick exterior. Each floor has a continuous perimeter window exposure totaling 12,000 SF of glass. The building also contains a cafeteria and medical facilities. This hallmark project was completed on-schedule in less than two years.
Client
Ohbayashi Corporation(Construction Manager for Toyota)