Our Work

SEGS Units II, III, IV, V, VI, VII

Project Scope

Engineering, procurement, and construction of the original SEGS arrays including Units II-VII.  Each Unit consisted of an approximately 150-acre solar field with approximately 1.8 – 2.5 million square feet of parabolic mirror collectors; a 310,000 lbs/hr., 1,565 psig at 954 degrees F boiler with superheaters; a 33.8 MW turbine generator and appurtenances; water treatment facilities; and substation facilities for distribution into the Southern California Edison Grid.  The project was performed, in all stages, on-time and to high praise from the Owner.

Challenged by fast-track schedules, the team set up an onsite “factory” in the Mojave Desert where hundreds of workers mass- produced the generation system components. Total value of the contract was $500M+.

Client

Luz Solar Partners

“The Contractor’s project team was comprised of qualified individuals and their communication and early identification of issues led to early resolution on many items. All in all it was a very enjoyable project team to get to be apart of.”

- Aaron Sundberg, Construction Manager, NAVFAC Hawaii

“Navigating extreme logistical challenges, a multi-national workforce, and an ever-evolving security environment were all uniquely amplified in this project, all while working on an active post whose critical mission could not be interrupted. The Caddell team did all of this and achieved the project’s objectives. Congratulations on a job well done!”

- Chrissie Fields, Department of State Contracting Officer

“Pull Planning saved our schedule and gave us a practical way forward. This intense interaction with the subs also identified some schedule busting elements that the design documents had missed. We not only met our original schedule completion date, but finished critical activities early and ended the project with an official “Outstanding” performance rating in all categories— including scheduling.”

- Jeremy Clegg, Caddell Project Manager

“You can be very proud of what your team accomplished.”

- Gary Pemberton, Project Engineer, USACE, Kansas City District

“I wanted to commend your project team for a job very well done.  I have had the privilege of designing numerous exchange and commissary facilities and would count this project as among the best managed and organized of my career.”

- Terry Lee, AIA, Project Architect of Record / Breckenridge Group

“This project is a shining example that a project performed in a true spirit of partnering can produce a quality facility”

- Ms. Donna Lamb, GSA Contracting Officer

“Safety performance was first class and we observed that Caddell placed a very high priority on site safety and health. …The site was located in the middle of a busy college campus and effective safety protections and precautions were critical.” 

- John Chesnut, Senior Field Coordinator Construction Office of the University of Alabama

“I have been serving the Savannah District’s Fort Bragg office since 2000 and would rate this project among the best of my career.”

- Karl A. Gabzdyl, Resident Engineer, USACE / Fort Bragg Office