Project Scope
Consisted primarily of the construction of a fuel hydrant pumping system which included eight 1,000 GPM pumps, eight filter/separators and piping and accessories for connection to three 51,000 BBL storage tanks with terminal apron hydrant fueling system. Also included in this project’s scope were a fuel reclamation system, truck off-loading/fuel re-circulation system, mogas storage and dispensing system, oil-water interceptor, and site work including grading, drainage system, pavement and sidewalks. Performed during regular ongoing airport operations and completed on-budget and on-schedule despite these logistical challenges.
Client
Raleigh-Durham Airport Authority