2700 Lagoon Park Dr., Montgomery, AL 36109 | 334.272.7723
Resource Recovery Facility  Hennepin County, MN

Client: Hennepin Energy Resource Co.

Scope included the design, construction, and operation of a waste-to-energy facility with the capacity to process 365,000 tons of waste per year.  Plant includes two solid waste combustion systems. each having a capacity of 600 tons per day; two natural circulation heat recovery boilers producing 288,250 pounds per hour at 650 psig and 750 degrees F; a 38-MW turbine generator; two dry scrubbers and two high efficiencty baghouse collectors; and a refuse storage bunker with storage capacity of 8,309 tons of solid waste. $82.5M