2700 Lagoon Park Dr., Montgomery, AL 36109 | 334.272.7723
UAV Vehicle Hangar & Runway Complex  Camp Mackall, NC

Customer: U.S. Army Corps of Engineers, Savannah District

Caddell performed the design and construction of a standard hangar for the MQ-1C Gray Eagle Unmanned Aerial Vehicle. Scope of work included an operations and maintenance hangar with shops, and supply, company administration and supply space, tool and parts storage 5-ton bridge crane, oil water separator, oil and hazardous material storage, aircraft container storage, organizational vehicle parking, information systems, fire protection and alarm systems, intrusion detection installation and EMCS connection. Work also included runway overlay, replace taxiway and shoulders, taxiway lighting, and access apron. Also included is the 82d CAB TEMF expansion. Completed on-time with zero lost-time accidents and the highest possible performance ratings by the Owner.  $32.1M

Highlights: ♦Winner of 2016 ABC Excellence in Construction National Eagle Award / Category, Pre-Engineering Buildings. ♦Winner of Alabama AGC and Alabama ABC Project Excellence Competitions.